GB/T 42405.1-2023

Smart Manufacturing Application Interconnection Part 1: Integration Technical Requirements (English Version)

GB/T 42405.1-2023
Standard No.
GB/T 42405.1-2023
Language
Chinese, English version preview
Release Date
2023
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 42405.1-2023
Introduction

Analysis of CPS integrated interconnection technology architecture

The information-physical fusion system (CPS) integration architecture proposed in this standard includes three core components: protocol wrapper, management shell, and message flow pipeline, and realizes the integration of IT/OT/Internet domains through a layered transformation model.

Technical Dimensions Traditional Integration Methods CPS Integration and Interconnection Solutions
Protocol Adaptation Point-to-point Custom Development Parameterized Protocol Templates (Supporting 12 Types of Industrial Protocols)
Data Conversion Hard-coded Mapping Dynamic Format Conversion Based on Management Shell Model
Message Transmission Direct Call Asynchronous Message Queue + Transaction Compensation Mechanism

Key Technology Implementation Requirements

1.

The standard requires that the protocol wrapper must include:

  • Unique ID: automatically generated according to the service encoding rules
  • Protocol adaptation template: supports 10 types of protocols such as MQ/HTTP/OPC UA
  • Management shell model: contains the structured definition of the routing domain (Header) and the data domain (Body)

Application Case: Integration of ERP and MES Systems

An automotive parts company encapsulated the material master data interface of SAP ERP into a standard MQ service through the RFC protocol adapter. The MES system automatically synchronizes the production plan by subscribing to the service, and the integration efficiency is improved by 70%


2. Message Standard

The standard stipulates that the XML message must contain the following structure:

 <Service> <Route> <SourceSysID>02001</SourceSysID> <ServiceID>00010000000100</ServiceID> <SerialNO>2016051727635262123</SerialNO> </Route> <Data> <Control/> <Request>...</Request> </Data> </Service> 

Implementation Suggestions

1. Phased Construction Path

  1. Protocol Standardization Phase: Prioritize the adaptation of industrial protocols such as OPC UA and Modbus
  2. Service encapsulation phase: Service-oriented system interfaces such as SCADA and MES
  3. Process orchestration phase: Cross-system business collaboration through message flow pipelines

2. Key points for performance optimization

  • Control the size of a single message to ≤5MB, and split it if it exceeds 1MB
  • Control the response time of the intranet to within 5 seconds, and that of the external network to no more than 10 seconds
  • Deep monitoring of message queues, and setting of automatic compensation mechanism

GB/T 42405.1-2023 history

  • 2023 GB/T 42405.1-2023 Smart Manufacturing Application Interconnection Part 1: Integration Technical Requirements

GB/T 42405.1-2023 -All Parts




Copyright ©2007-2025 ANTPEDIA, All Rights Reserved