GB/T 8564-2023
Technical Specifications for Installation of Hydrogenerator Sets (English Version)

GB/T 8564-2023
Standard No.
GB/T 8564-2023
Language
Chinese, English version preview
Release Date
2023
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 8564-2023
Replace
GB/T 8564-2003
Scope
This document specifies the requirements for vertical Francis turbines, axial flow turbines, horizontal Francis turbines, Pelton turbines, speed control systems, turbine main flash and accessories. It also covers the installation and commissioning of vertical turbine generators, horizontal turbine generators, excitation systems and static variable frequency starting devices (CSFC), bulb-type hydro-generator sets and auxiliary equipment of hydropower stations. In addition, the document also includes installation electrical tests of turbine generator stators and rotors and start-up and trial operation of turbine generator sets. This document is applicable to the installation and acceptance of Francis, axial flow, Pelton, bulb-type hydro-generator sets and mixed flow reversible pumped storage units.

GB/T 8564-2023 Referenced Document

  • DL/T 1245 Technical guide for hydraulic turbine regulating system in grid
  • DL/T 1770 Technical specification for filling and drainage of pumped storage power station water delivery system
  • DL/T 1818 Test procedure for reversible pump-turbine regulating system
  • DL/T 2194 Technical requirements and test guidelines for primary frequency regulation of hydroelectric generating units
  • DL/T 474.1 Implementation guidelines for on-site insulation tests
  • DL/T 489 Test regulations for static rectification and excitation system of large and medium hydro-generators
  • DL/T 490 Rule for installation and accepting test regulation of the generator excitation system
  • DL/T 496 Test guide for adjustment of hydraulic turbine electro-hydraulic regulating systems and devices
  • DL/T 507 Start-up test code for Hydro-generating units
  • DL/T 5070 On-site manufacturing, installation and welding process guidelines for turbine metal volutes
  • DL/T 563 Technical regulations for hydraulic turbine electro-hydraulic regulating systems and devices
  • DL/T 827 Start-up test code for bulb Hydro-generating units
  • DL/T 862 Regulations for Installation and Acceptance of Automation Components (Devices) in Hydropower Plants
  • GB 50147 Code for construction and acceptance of high-voltage electric equipment installation engineering
  • GB 50148 Code for construction and acceptance of power transformers oil reactor and mutual inductor
  • GB 50150 Electric equipment installation engineering-standard for hand-over test of electric equipment
  • GB 50168 Construction and acceptance standards for cable lines in electrical installation engineering
  • GB 50171 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering
  • GB/T 10969 Specification for water passage components of hydraulic turbines,storage pumps and pump-turbines
  • GB/T 17116.1 Pipe supports and hangers—Part 1:Technical specification
  • GB/T 18482 Specification for start-up test of reversible pumped-storage units
  • GB/T 2900.25 Electrotechnical terminology.Rotating electrical machines
  • GB/T 29712 Weld non-destructive testing ultrasonic testing acceptance level
  • GB/T 32899 Test procedure for static variable frequency starting device of pumped storage unit
  • GB/T 40734 Non-destructive testing of welds—Phased array ultrasonic testing(PAUT)—Acceptance levels
  • GB/T 8564 Technical Specifications for Installation of Hydrogenerator Sets
  • NB/T 35089 Technical specifications for turbine cylindrical valves
  • NB/T 47013.10 Nondestructive testing of pressure equipments .Part 10: Ultrasonic time of flight diffraction technique
  • NB/T 47013.4 Nondestructive testing of pressure equipments.Part 4: Magnetic particle testing
  • NB/T 47013.5 Nondestructive testing of pressure equipments.Part 5: Penetrant testing

GB/T 8564-2023 history

  • 2023 GB/T 8564-2023 Technical Specifications for Installation of Hydrogenerator Sets
  • 2003 GB/T 8564-2003 Specification installation of hydraulic turbine generator units
  • 1988 GB 8564-1988 Specification for installation of hydraulic-turbine and generator units