Core changes in the standard revision

Technical field 2022 edition 2023 edition
Model representation Roman letter modification number Chinese character modification number (example: YSP23.9/壹/10)
Structural type Gas-liquid two-phase bottle Single liquid phase bottle (YSP118/液/49.5 needs to be marked with "液")
Safety management No clear restrictions on where to use YSP118 series is prohibited from being installed indoors in buildings, and other models are prohibited from entering crowded places.

Key design parameters

Working conditions:Ambient temperature -40℃~60℃, nominal working pressure 2.1MPa
Volume range:Nominal volume ≤150L (new YSP118/49.5 large capacity model)
Material requirements:
  • Chemical composition: C≤0.20%, Mn content 0.7-1.50%
  • Mechanical properties: Yield ratio ≤0.85 when tensile strength ≥490MPa

Key points of manufacturing process control

Welding specifications

Weld type Technical requirements
Butt weld Reinforcement height 0-2.5mm, misalignment ≤0.1S0
Electronic tag welding Laser welding, must pass 144h salt spray test

Heat treatment requirements

Overall heat treatment temperature deviation ±25℃, temperature curve must be automatically recorded, and re-heat treatment must be performed after repair


Inspection and testing system

Batch inspection rules:
  1. Radiographic inspection: 20% random inspection of longitudinal circumferential welds
  2. Burst test: volume deformation rate ≥12% (Rm>490MPa)
  3. Pressure cycle: 12,000 times 3.2MPa pressure test
Electronic identification verification: Need to pass 800-1000℃ flame combustion test for 1 minute

Implementation suggestions

Manufacturers

1. Establish electronic tag welding process assessment files
2. The water pressure test data retention period is extended to 8 years
3. Note that the diameter of the YSP118 series shield is increased to 380mm

User

1. Regularly check that the steel stamp depth is ≥0.7mm
2. The liquid phase bottle needs to be connected to a special gasification device
3. It is strictly forbidden to modify the electronic traceability mark without authorization

GB 5842-2023 history

GB 5842-2023 LPG cylinder has been changed from GB/T 5842-2022 Liquefied petroleum steel gas cylinders.




Copyright ©2007-2025 ANTPEDIA, All Rights Reserved